The Trump administration has described its desire to achieve energy independence for America. It also made a large deal of cutting the administrative red strip, which is believed to slow the development of emerging industries. So why, one might ask, the Minister of Interior Doug Burgum Sink Who is the main external wind farm on the assumed concerns that the Biden administration “rushed through its approval without sufficient analysis?”
This is a rhetorical question, of course. Apparently, the reason is that Donald Trump and his cabinets do not simply want clean energy and danger to the final result of their donors in making fossil fuels. So Empire Wind, a project that started construction last year off the New York Beach and would have generated carbon -free electricity for 500,000 homes by the time when it was completed in 2027, is now Dead.
Burgum Secretary He said The decision to stop Empire Wind is in line with Trump’s executive orderHe was signed on his first day in the office, this term, which called for the suspension of all rental and allowing new external wind projects – although it is useful to note that Empire Wind is not new, as a federal lease contract has been held since 2017, already through federal and federal permit operations. The construction was already underway, and it was expected that the project, which used 1500 people, was expected to start power Early next year.
According to The memo that the free lighthouse obtainedBurgoum said that the Empire Wind will be stopped because “the approval of the project has been transferred through the previous administration without sufficient analysis or consultation between the relevant agencies in relation to the possible effects of the project.” Last week, the same inner section Declare It will lead to the abolition of the requirements of Biden’s era to conduct a full review to show the environmental impact of 3,244 oil and gas rental, describing the “long” process and clarifying that the decision was part of “limiting the organizational barriers of oil and gas companies and accelerating the development of local energy.”
Thus, the red tape decreases for oil and gas projects. In fact, it has nothing to do with, oil and gas companies I threw more than $ 75 million In Trump’s PACS cabinets during the 2024 election session. Meanwhile, clean energy appears to stare in a maze of artificial regulatory obstacles that the Trump administration will use to grind each project, even under construction already, for a full endowment.
This is not a complete surprise. Trump’s promise would be there.There are no new air millsDuring his term, he has long assumed a problem with technology, which is The allegations falsely are the slaughter of birds indefinitely It is a visual lesion (your miles may differ on it). But it is somewhat amazing that his administration will go to the extent of anxial projects that are already taking place instead of just depleting new projects. The administration appears to be in war with clean energy, although the wind in particular is The fastest growth and the lowest cost Electricity source in the country.
https://gizmodo.com/app/uploads/2021/03/d2larj6tv5qsredcnqdi.jpg
Source link